Week of 12 October 2026 — team

Status: draft from Rufus's Monday planning session (design + website focus); other areas carried from last week, to confirm with owners.

Change since last week

Reordered: the new SoR website goes live first, target Thu 16 Oct, ahead of the launch (1 Nov still the latest). Website build tasks move to the sor-website repo's own Beads; lip-mp5 becomes a pointer. New pages are built directly in sor-website; the design repo keeps the design system. SoR experiences (design-323) are paused (deferred in Beads).

Focus

  • SoR website live (rufus): new site at seedsofrenaissance.org by 16 Oct, launch-scope pages migrated — lip-mp5 (moving to sor-website Beads), home page design-70q (Sylvie leads content), IA and naming design-3mb, launch blockers in sor-website/docs/launch-todo.md (TODOs, old-domain links, contact emails), dependency check then cut-over lip-mp5.6, lip-mp5.5.
  • Design system to minimal standard (rufus, sylvie): the team can make on-brand material for every launch channel without asking. Finish line is the ds:v1 label in the design repo (bd list --label ds:v1). This week: review pass design-34t.13 (red, voice, media house line, member noun), font licences design-34t.2 (needed before fonts go public on 16 Oct), close slides design-34t.12, then Sylvie's notes design-34t.14.
  • Launch comms kit (uriel, to confirm): social set design-34t.15, Instagram design-lpe.8, Canva design-34t.19 (after licences); newsletter signup on the site lip-33m if it ships with the site (then email template design-34t.18).
  • Global Connection Call (petronella): first call 22 or 29 Oct, to fix this week — calls-hwt, lip-db4.
  • Ops backlog and inbox reviews (asdra, fae): carried from last week — lip-duo, lip-06j, lip-87i.

Hard dates

  • 2026-10-16 — new SoR website live (target) — lip-mp5 (rufus)
  • 2026-10-22 or 2026-10-29 — first Global Connection Call — calls-hwt (petronella)
  • 2026-10-29 — Collective Action course starts — lip-cff
  • 2026-11-01 — Seeds of Renaissance launch at the latest — 2607 (uriel)

Not this week

  • SoR experiences (design-323, paused).
  • Design system beyond ds:v1: YouTube polish and channel set (design-34t.5, .6), podcast covers (.8, .16), sub-brands (.11), deck redo (.36), print and tidy items.

Fix in trackers

  • bd init in sor-website (rufus), then move lip-mp5 open children, design-70q, design-3mb and launch-todo items there; lip-mp5 becomes a pointer epic.
  • design-323.11 still claimed by Rufus while deferred: bd unclaim (holder only).
  • design-34t itself shows in progress with an expired lease.
Built with LogoFlowershow