Open for commentsSelect text to comment

Weekly review — week of 2026-10-26

Generated 2026-10-26T15:46:58 · step done · 27 active, 3 iced, 1 closed (not listed) · 53 gaps · 7 shortlisted

Sources: cache portfolio/projects-cache.json (2026-10-26) · previous review none · latest week plan weeks/2026-10-12.md. Rendered from the JSON by scripts/review_render.py; edit the JSON, not this page.

Shortlist

Shipping

  1. Collective Action Course (Courses, rufus) — ★★★ — Starts Wed 28 Oct (record is right; roadmap 29 Oct is out of date). Rufus takes the delivery tasks in tworc-wse. ✓
  2. Seeds of Renaissance Global Connection Call — First Iteration (Calls & Catalysts, petronella) — ★★★ — First call Thu 29 Oct, 20:30–22:00 CET, already confirmed in the record and calls-hwt. Zoom and Luma setup tasks are overdue. ✓
  3. Seeds of Renaissance Brand Rollout — 2026 (Seeds of Renaissance, uriel) — ★★★★ — Before 1 Nov only the minimum: social profiles and moving the newsletter. The rest follows the launch. ✓
  4. Seeds of Renaissance Website — 2026 (Seeds of Renaissance, rufus) — ★★★★ — Site is live. Before launch: the pre-launch pass only; fonts, Stripe and the ecosystem site wait until after 1 Nov. ✓
  5. Project-Management Infrastructure — 2026 (Life Itself Management, rufus) — ★★★ — Ship the planning system itself: the weekly review (2620), records for every project, and the tools trial running to the 5 Nov end date (Rufus). ✓
  6. Content Production and Marketing Pipeline — 2026 (Media House, uriel) — ★★★ — The content factory: planning (LTP) is done but not yet implemented (Rufus). Uriel owns it; tasks may be in Asana. ✓ Questions:
    • Which first piece of the pipeline does Uriel want running this week?

Sharing

  1. Seeds of Renaissance Launch — 2026 (Seeds of Renaissance, uriel) — ★★★★ — Launch on 1 Nov stands (Rufus); Uriel owns the launch checklist this week. Epic lip-42k.3 has no ready Beads task, but Media House tasks may be in Asana: ask Uriel. ✓

Drill-down

Seeds of Renaissance Launch — 2026 — ask-media-house

  • Planning: record ✓, done-when ✓, tree ✓
  • Route: lip-42k.3, 0 ready
  • Key tasks: none
  • Note: Media House project: launch tasks are probably in Asana. Ask Uriel for the launch checklist and its owner this week. The Beads launch epic (lip-42k.3) only has two stale planning tasks from 17 Sep (lip-42k.3.1, .3.2); propose closing them if the Asana checklist is the plan.

Collective Action Course — ready

  • Planning: record ✓, done-when ✗, tree ✗
  • Route: tworc-wse, 7 ready
  • Key tasks: tworc-wse.3 Calendar invites for the live sessions Wed 28 / Thu 29 / Fri 30 (asdra); tworc-wse.4 Set up the Zoom link and add it to Luma and the invites (asdra); tworc-wse.5 Confirm session 1 materials are ready (rufus)
  • Note: Asdra runs delivery (invites, Zoom, emails, comms log) with Rufus supporting; Rufus confirms session materials. Planning thin (no done_when). tworc-wse.1 is done (record fixed today).

Seeds of Renaissance Global Connection Call — First Iteration — ready

  • Planning: record ✓, done-when ✓, tree ✗
  • Route: calls-hwt, 10 ready
  • Key tasks: none
  • Note: Setup tasks in calls-hwt are done but still open (Rufus): close them. This week is the final announcement and running the first call on Thu 29 Oct; no beads exist for either yet (harvest creates them).

Seeds of Renaissance Brand Rollout — 2026 — ask-media-house

  • Planning: record ✓, done-when ✓, tree ✓
  • Route: lip-42k.2, 0 ready
  • Key tasks: lip-42k.2.4 Migrate Substack newsletters to our own newsletter infrastructure (no owner)
  • Note: Media House project: social-profile work is probably in Asana or comms issues; ask Uriel. The newsletter move is in Beads but unassigned and blocked.

Seeds of Renaissance Website — 2026 — ready

  • Planning: record ✓, done-when ✓, tree ✗
  • Route: sorw-ol5, None ready
  • Key tasks: sorw-ol5.7.13 Pre-launch final pass: AI sweep, then one human pass (no owner); sorw-ol5.10.30.1 Forms: create the Turnstile widget (before launch) (no owner)
  • Note: Pre-launch final pass and the form spam check, then final checks before 1 Nov. Epic sorw-ol5 not listed in the record (harvest edit).

Project-Management Infrastructure — 2026 — ready

  • Planning: record ✓, done-when ✓, tree ✓
  • Route: lip-tqk, 41 ready
  • Key tasks: lip-tqk.76.2 Finish the 26 Oct review: gate 2, harvest, week plan (rufus); lip-tqk.30 One-page rule for work that spans Asana and Beads/GitHub (uriel); lip-tqk.32 Portfolio lists all initiatives and areas with their locations (rufus)
  • Note: Beads coverage is good: the LTP mapped every obstacle to a bead under five features (lip-tqk.70–.74), 43 open, 41 ready. The problem is ordering, not missing beads: nothing says which one per feature comes next. Proposal: one next task per feature this week; the briefing lip-tqk.42 (due 23 Oct) is overdue.

Content Production and Marketing Pipeline — 2026 — ready

  • Planning: record ✓, done-when ✓, tree ✓
  • Route: lip-93f.2.16, 3 ready
  • Key tasks: lip-93f.2.16 Implement content pipeline v1 from the LTP (no owner); lip-93f.2.16.15 Brief and approvals (uriel)
  • Note: Planning (LTP) done; implementation epic lip-93f.2.16 is ready but unassigned. Ask Uriel which first piece runs this week; some tasks may be in Asana.

Harvest

Permanent record edits

  • projects/2609-seeds-of-renaissance-website.md: beads: add sorw-ol5; status note 2026-10-26: pre-launch pass and final checks this week; fonts, Stripe and ecosystem site after 1 Nov (Rufus, weekly review). ✓ applied
  • sor-community/projects/2611-seeds-of-renaissance-global-connection-call-v1.md: beads: add calls-hwt; status next → in-progress; status note: setup done, first call Thu 29 Oct (Rufus, weekly review). ✓ applied
  • 2r-course/projects/2026-collective-action-course.md: status note: Asdra runs delivery with Rufus supporting, from 28 Oct (Rufus, weekly review). ✓ applied
  • projects/2607-seeds-of-renaissance-launch.md: status note: 1 Nov confirmed; Uriel owns the launch checklist (Rufus, weekly review). ✓ applied
  • projects/2606-seeds-of-renaissance-brand-rollout.md: status note: before 1 Nov only social profiles and the newsletter move (Rufus, weekly review). ✓ applied

This week

Goal: Seeds of Renaissance launches on 1 Nov, the Collective Action course runs 28–30 Oct, and the first Global Connection Call runs on 29 Oct.

Focus:

  • 2607-seeds-of-renaissance-launch (uriel): Launch on 1 Nov from Uriel's checklist — lip-42k.3
  • 2026-collective-action-course (asdra): Three live sessions run, invites and Zoom in place (Rufus supports, owns materials) — tworc-wse.3, tworc-wse.4, tworc-wse.5
  • 2611-seeds-of-renaissance-global-connection-call-v1 (petronella): Final announcement out; first call runs Thu 29 Oct — calls-hwt
  • 2606-seeds-of-renaissance-brand-rollout (uriel): Social profiles and newsletter move done before launch — lip-42k.2.4
  • 2609-seeds-of-renaissance-website (rufus): Pre-launch pass, form spam check and final checks done — sorw-ol5.7.13, sorw-ol5.10.30.1
  • 2605-project-management-infrastructure (rufus): Weekly review in use; cross-tool rule written; portfolio complete — lip-tqk.76.2, lip-tqk.30, lip-tqk.32
  • 2602-content-delivery-pipeline (uriel): First piece of the content factory running (Uriel picks) — lip-93f.2.16

Hard dates:

  • 2026-10-28 — Collective Action course starts (sessions 28, 29, 30 Oct) — tworc-wse
  • 2026-10-29 — First Global Connection Call, 20:30 CET — calls-hwt
  • 2026-10-29 — Cross-tool rule due — lip-tqk.30
  • 2026-11-01 — Seeds of Renaissance launch — 2607-seeds-of-renaissance-launch

Stretch 🏆:

  • Ship one edited video on our YouTube channel, e.g. from the recorded podcast backlog (Alexander, Palmer, Unger), using the light-touch YouTube SOP (uriel) — podcast-94a, lip-93f.2.16.4
  • Content factory set up with a visible backlog: the content backlog list triaged and in use (uriel) — lip-93f.2.16.17

Not this week: 2621-wisdom-white-paper, 2612-comms-infrastructure, 2627-retreat, 2628-film, 2603-content-strategy-and-plan

Beads

  • update tworc-wse.2 .3 .4 .6 in 2r-course: –assignee asdra ✓ applied
  • update tworc-wse.5 in 2r-course: –assignee rufus ✓ applied
  • close tworc-wse.1 in 2r-course: done: record fixed 26 Oct ✓ applied
  • close calls-hwt.1 calls-hwt.2 calls-hwt.3 calls-hwt.4 calls-hwt.7 calls-hwt.10 calls-hwt.11 calls-hwt.14 calls-hwt.15 calls-hwt.16 calls-hwt.17 calls-hwt.18 calls-hwt.20 in sor-community: setup done (Rufus, 26 Oct review) ✓ applied
  • create new in sor-community: "Final announcement for the first Global Connection Call (29 Oct)" –parent calls-hwt –assignee petronella –due 2026-10-28 ✓ applied
  • create new in sor-community: "Run the first Global Connection Call, Thu 29 Oct 20:30 CET" –parent calls-hwt –assignee petronella –due 2026-10-29 ✓ applied
  • update sorw-ol5.7.13 sorw-ol5.10.30.1 in sor-website: –assignee rufus ✓ applied

People

  • rufus: Website pre-launch pass and final checks; course materials and support for Asdra; finish this review; portfolio complete (lip-tqk.32).
  • asdra: Collective Action course delivery: invites, Zoom, emails, comms log (tworc-wse); task data clean-up (lip-tqk.27, due 4 Nov).
  • uriel: Launch checklist for 1 Nov; brand rollout minimum; first piece of the content factory; cross-tool rule by 29 Oct (lip-tqk.30).
  • petronella: Final announcement and running the first Global Connection Call on Thu 29 Oct.

Projects

Active projects. Priority is the last logged value with its source (history, not truth). ↑ = owner inherited from the initiative.

InitiativeProjectPriority (last)PhaseStatusOwnerEpics (ready/open)Latest note
Life Itself ManagementProject-Management Infrastructure — 2026★★ (record)shippingin-progressrufuslip-1ie 2/3, lip-tqk 41/57, lip-tqk.29 5/6, lip-tqk.17 1/12026-10-22 — Uriel (via Rufus): AI can read and update Asana, but only the Media House te…
Life Itself ManagementLife Itself Roadmap — September–December 2026—shapingunknown ⚠rufus ↑—2026-10-09 — Rufus confirmed Life Itself Management as this project’s parent initiative.
Life Itself ManagementSylvie's Email Management—shapingin-progressfaelip-kr1 6/122026-10-22 — Where-it-stands summary added from the SCQH; context from Fae's tasks board …
Life Itself ManagementSylvie PA Flow—shapingin-progressfae—2026-10-22 — Private banner replaced with a draft note: Fae still to review; not agreed w…
Life Itself ManagementWeekly Portfolio Review — 2026—shapingin-progressrufus—2026-10-26 — Created with Rufus as a sub-project of Project-Management Infrastructure, fr…
Life Itself ManagementShared Agent Skills — 2026—shippingin-progressrufuslip-tqk.29 5/6, agentskills-3gx 19/192026-10-26 — Record created from the project candidates note (planning lip-tqk.75) as a…
OpsLife Itself Operations — 2026★★ (record)shippingin-progressrufuslip-duo 4/92026-10-26 — Phase inbox → shipping to match status in-progress, from the sweep's record …
OpsAI Training and Integration — 2026★ (record)shapingin-progressrufuslip-d4l 5/6, lip-q31 3/6, lip-kv8 5/52026-10-26 — Phase inbox → shaping to match status in-progress, from the sweep's record c…
OpsForumMagnum Deployment—shapingin-progressrufus—2026-10-26 — Rufus: ForumMagnum is for the Seeds of Renaissance forum; it stays under Ops…
Seeds of RenaissanceSeeds of Renaissance Launch — 2026★★★★ (record)shapingin-progressuriellip-42k.3 0/22026-10-12 — Rufus: reordered so the new website goes live first (target 16 Oct), ahead o…
Seeds of RenaissanceSeeds of Renaissance Rebrand — 2026★★★★ (record)shapingin-progressuriellip-42k.1 3/42026-10-22 — Context from Fae's tasks board added (onboarding #124, #127). Tasks belong i…
Seeds of RenaissanceSeeds of Renaissance Brand Rollout — 2026★★★★ (record)shippingin-progressuriellip-42k.2.3 0/0, lip-42k.2 0/42026-10-26 — Rufus: the SoR experiences (poetic animated pieces, design design-323, pla…
Seeds of RenaissanceSeeds of Renaissance Website — 2026★★★★ (record)shippingin-progressrufus—2026-10-26 — Phase shaping → shipping: the site is live at seedsofrenaissance.org and bei…
Seeds of RenaissanceSeeds of Renaissance website review—shippingin-progressrufus—2026-10-26 — Now a sub-project of the Seeds of Renaissance Website (2609), and given phas…
Calls & CatalystsSeeds of Renaissance Global Connection Call — First Iteration★★★ (record)shapingnextpetronella—2026-10-22 — Time changed to 20:30–22:00 CET (19:30–21:00 UK), still 90 minutes, replacin…
Calls & CatalystsSeeds of Renaissance Hosting Guide—shapingunknown ⚠petronella ↑—2026-10-22 — Troy's drafts are no longer needed (per Petronella). The 16 Sep plan for him…
Life Itself ResearchAI Sensemaking — Wise AI—shapingin-progressrufusais-61b 0/3, ais-rpq 5/7, ais-q7s 0/02026-10-26 — Record created in research from the project candidates note (planning `lip-t…
Life Itself ResearchReason Commons—shapingin-progressrufus—2026-10-26 — Record created from the project candidates note (planning lip-tqk.75); Ruf…
Life Itself ResearchWay Into AI — 2026—shippingin-progressrufuswayintoai-bnd 1/1, wayintoai-94n 4/52026-10-26 — Record created from the project candidates note (planning lip-tqk.75). Ruf…
Media House2612 Comms Infrastructure — CRM, Newsletters and Operating Procedures★★★ (record)shapingin-progressrufuslip-upn 4/82026-10-09 — Vision, needs and job stories moved here from the comms and crm repos (2612-…
Media HouseContent Production and Marketing Pipeline — 2026★★ (record)shippingin-progressuriellip-93f.2.14 0/0, lip-93f.2 16/232026-10-22 — Context from Fae's tasks board added (onboarding #147, #107, #126). Tasks be…
Media HousePublications SOP — developing and releasing publications★ (record)shapingin-progressrufuslip-93f.2.14 0/02026-10-08 — The working SOP now lives in 2rbook (docs/publishing-a-white-paper.md), writ…
Media HouseContent Publishing — Strategy and Delivery—shapingin-progressuriel ↑lip-93f.2.14 0/0, lip-93f.2 16/23, lip-93f 17/242026-09-25 — Rufus: not an initiative any more, just strategy/delivery work within Media …
CoursesCollective Action Course—shippingin-progressrufustworc-wse 7/72026-10-26 — Typed for the Life Itself portfolio sweep (planning lip-tqk.75): type, own…
MagazineMagazine Marketing and PR — 2026—shapingunknown ⚠sylvie ↑lip-str 14/142026-10-22 — Magazine operations context added from Fae's tasks board (onboarding #118, #…
MagazineEternity — Magazine Issue 3—shapingin-progresssylvielip-str 14/142026-10-22 — Created by Fae as its own record, folded out of the Eternity section of the …
Publications (Book & White Papers)Wisdom White Paper — 2026—sharingin-progressrufusrbook-8k3 2/32026-10-26 — Record created from the project candidates note (planning lip-tqk.75). Ruf…

Ice box

Gaps

repo-no-record 7, epic-no-project 14, record-missing 11, record-stale 1, initiative-no-projects 6, initiative-no-repo 2, epic-no-owner 12.

#KindSubjectEvidenceSuggested fixAccepted
g01repo-no-recordcrmpushed 2026-10-25; no record, initiative or beads prefix names itCheck crm: if it is the CRM tool for 2612, list it under that record's repos; else add to IGNORE_REPOS in scripts/review_prepare.py.—
g02repo-no-recordpdf-report-publishingpushed 2026-10-25; no record, initiative or beads prefix names itCheck pdf-report-publishing: likely tooling for 2613 Publications SOP / 2621 Wisdom paper; link from that record or add to IGNORE_REPOS.—
g03repo-no-recorddesignpushed 2026-10-23; no record, initiative or beads prefix names itdesign is the SoR design system repo (ds:v1): link it from 2606 Brand Rollout or add to IGNORE_REPOS.—
g04repo-no-recorddevelopmentalspaces.orgpushed 2026-10-13; no record, initiative or beads prefix names itAdd a record in developmentalspaces.org/projects/ under an initiative or add the repo to IGNORE_REPOS.—
g05repo-no-recordonboardingpushed 2026-10-12; no record, initiative or beads prefix names itAdd a record in onboarding/projects/ under an initiative or add the repo to IGNORE_REPOS.—
g06repo-no-recordreason-commons-tuipushed 2026-10-11; no record, initiative or beads prefix names itAdd a record in reason-commons-tui/projects/ under an initiative or add the repo to IGNORE_REPOS.—
g07repo-no-recordcontentpushed 2026-10-08; no record, initiative or beads prefix names itAdd a record in content/projects/ under an initiative or add the repo to IGNORE_REPOS.—
g10epic-no-projectrbook-l9o (2rbook)open epic "Papers: authoritative Markdown from Google Docs, to the Wisd", no project: label, not in any record's beadsLabel project:<slug> or list it in the record's beads; if no project fits, propose a record.—
g11epic-no-projectais-qdf (ai-wise)open epic "Natasha pack: epub for her flight (due 2026-10-19 15:00)", no project: label, not in any record's beadsPast due (19 Oct): close if the epub was delivered, else relabel.—
g15epic-no-projectmoloch-gpl (collective-action)open epic "Course infrastructure", no project: label, not in any record's beadsLabel project:2026-collective-action-course (collective-action repo, course content) or list in that record's beads.—
g16epic-no-projectmoloch-wmp (collective-action)open epic "Reading & sources", no project: label, not in any record's beadsLabel project:2026-collective-action-course or list in that record's beads.—
g17epic-no-projectmoloch-dhe (collective-action)open epic "Example bank", no project: label, not in any record's beadsLabel project:2026-collective-action-course or list in that record's beads.—
g18epic-no-projectmoloch-du2 (collective-action)open epic "Course modules", no project: label, not in any record's beadsLabel project:2026-collective-action-course or list in that record's beads.—
g19epic-no-projectops-france-19t (ops-france)open epic "Meeting with Gium: agenda", no project: label, not in any record's beadsOne-off meeting agenda: close after the meeting, or label to an ops-france record once one exists.—
g22epic-no-projectlip-42k (planning)open epic "Seeds of Renaissance rebrand programme", no project: label, not in any record's beadsLabel project:2608-seeds-of-renaissance-rebrand or list in 2608 beads (parent of lip-42k.1/.2/.3).—
g25epic-no-projectsorr-l57 (research)open epic "Relaunch the research group's output system", no project: label, not in any record's beadsLabel project:<slug> or list it in the record's beads; if no project fits, propose a record.—
g26epic-no-projectsorr-uhx (research)open epic "Restructure the research repo: site/ subfolder, initiatives/", no project: label, not in any record's beadsLabel project:<slug> or list it in the record's beads; if no project fits, propose a record.—
g27epic-no-projectsorr-3kr (research)open epic "Research group history and vision write-ups", no project: label, not in any record's beadsLabel project:<slug> or list it in the record's beads; if no project fits, propose a record.—
g29epic-no-projectcalls-hwt (sor-community)open epic "Global Connection Call: first series ready to run (29 Oct)", no project: label, not in any record's beadsLabel project:2611-seeds-of-renaissance-global-connection-call-v1 or list in that record's beads (its title says 29 Oct).—
g30epic-no-projectcalls-kwd (sor-community)open epic "Research community: web and knowledge presence and place in ", no project: label, not in any record's beadsLabel project:<slug> or list it in the record's beads; if no project fits, propose a record.—
g31epic-no-projectsorw-ol5 (sor-website)open epic "SoR website v1: live at seedsofrenaissance.org", no project: label, not in any record's beadsLabel project:2609-seeds-of-renaissance-website or list in 2609 beads.—
g34record-missing2026-09-seeds-of-renaissance-hosting-guidemissing owner, done_when, statusSet owner, done_when, status in https://github.com/life-itself/sor-community/blob/main/projects/2026-09-seeds-of-renaissance-hosting-guide.md.—
g35record-missing2026-collective-action-coursemissing done_whenSet done_when in https://github.com/life-itself/2r-course/blob/main/projects/2026-collective-action-course.md.—
g36record-missing2624-shared-agent-skillsmissing done_whenSet done_when in https://github.com/life-itself/skills/blob/main/projects/2624-shared-agent-skills.md.—
g37record-missing2622-ai-sensemakingmissing done_whenSet done_when in https://github.com/life-itself/research/blob/main/projects/2622-ai-sensemaking.md.—
g38record-missing2623-reason-commonsmissing done_whenSet done_when in https://github.com/life-itself/research/blob/main/projects/2623-reason-commons.md.—
g39record-missing2625-way-into-aimissing done_whenSet done_when in https://github.com/life-itself/wayintoai/blob/main/projects/2625-way-into-ai.md.—
g40record-missing2626-forummagnum-deploymentmissing done_whenSet done_when in https://github.com/life-itself/ops/blob/main/projects/2626-forummagnum-deployment.md.—
g41record-missing2600-life-itself-roadmap-september-decembermissing owner, done_when, statusSet owner, done_when, status in ../projects/2600-life-itself-roadmap-september-december.md.—
g42record-missing2601-ai-training-and-integrationmissing done_whenSet done_when in ../projects/2601-ai-training-and-integration.md.—
g43record-missing2610-content-publishingmissing owner, done_whenSet owner, done_when in ../projects/2610-content-publishing.md.—
g45record-missing2615-magazine-marketing-and-prmissing owner, statusSet owner, status in ../projects/2615-magazine-marketing-and-pr.md.—
g44record-stale2610-content-publishingstatus in-progress, latest dated note 2026-09-25Add a dated status note or change status.—
g46initiative-no-projectslife-itselfno open project records in life-itself/next.lifeitself.orgAdd a project record with the portfolio skill, or change the initiative status.—
g47initiative-no-projectsincubatorno open project records in life-itself/communityAdd a project record with the portfolio skill, or change the initiative status.—
g48initiative-no-projectsops-franceno open project records in life-itself/ops-franceAdd a project record with the portfolio skill, or change the initiative status.—
g49initiative-no-projectsgardens-of-changeno open project records in life-itself/sor-communityAdd a project record with the portfolio skill, or change the initiative status.—
g52initiative-no-projectspodcast-and-youtubeno open project records in life-itself/podcastAdd a project record with the portfolio skill, or change the initiative status.—
g53initiative-no-projectssocial-mediano open project records in life-itself/commsAdd a project record with the portfolio skill, or change the initiative status.—
g50initiative-no-repoonline-communitygithub empty, so no projects can be found for itSet github in initiatives/online-community.md, or change its status.—
g51initiative-no-repotopical-groupsgithub empty, so no projects can be found for itSet github in initiatives/topical-groups.md, or change its status.—
g08epic-no-ownertworc-wse (2r-course)epic linked to a project, no assigneebd -C ../2r-course update tworc-wse --assignee rufus—
g09epic-no-ownerrbook-8k3 (2rbook)epic linked to a project, no assigneebd -C ../2rbook update rbook-8k3 --assignee rufus—
g12epic-no-ownerais-61b (ai-wise)epic linked to a project, no assigneebd -C ../ai-wise update ais-61b --assignee rufus—
g13epic-no-ownerais-rpq (ai-wise)epic linked to a project, no assigneebd -C ../ai-wise update ais-rpq --assignee rufus—
g14epic-no-ownerais-q7s (ai-wise)epic linked to a project, no assigneebd -C ../ai-wise update ais-q7s --assignee rufus—
g20epic-no-ownerlip-d4l (planning)epic linked to a project, no assigneebd -C ../planning update lip-d4l --assignee rufus—
g21epic-no-ownerlip-upn (planning)epic linked to a project, no assigneebd -C ../planning update lip-upn --assignee rufus—
g23epic-no-ownerlip-93f (planning)epic linked to a project, no assigneebd -C ../planning update lip-93f --assignee uriel—
g24epic-no-ownerlip-kv8 (planning)epic linked to a project, no assigneebd -C ../planning update lip-kv8 --assignee rufus—
g28epic-no-owneragentskills-3gx (skills)epic linked to a project, no assigneebd -C ../skills update agentskills-3gx --assignee rufus—
g32epic-no-ownerwayintoai-bnd (wayintoai)epic linked to a project, no assigneebd -C ../wayintoai update wayintoai-bnd --assignee rufus—
g33epic-no-ownerwayintoai-94n (wayintoai)epic linked to a project, no assigneebd -C ../wayintoai update wayintoai-94n --assignee rufus—

Feedback log

  • 2026-10-26T17:00 (shortlist): "Yes as recommended (1 Nov stands; course 28 Oct, Rufus takes tworc-wse; call 29 Oct; rollout minimum before launch; website extras after launch; Wisdom waits; comms not this week). Add shipping the PM infrastructure itself and the content factory (planning done, not implemented). Show shaping/shipping/sharing at top level. Media House tasks may be in Asana: ask Uriel at drill-down rather than reading Asana." → Answers folded into reasons; 2621 and 2612 dropped to not_this_week; 2605 and 2602 added; work kind set per item; shortlist rendered grouped by kind.
  • 2026-10-26T18:00 (drilldown): "Yes, with: course is Asdra for much of it with Rufus supporting; connection call setup is done, this week is the final announcement and running the call; website yes plus final checks; PM infra has many beads and this work is part of it, concern the LTP did not generate enough feature beads with a first planning task; content factory yes." → Course tasks to Asdra (materials Rufus); call key tasks replaced by new announce/run beads and stale setup tasks proposed for closing; PM infra key tasks one per active stream incl. this review; coverage checked against the LTP.
  • 2026-10-26T18:30 (harvest): "Apply all. Add stretch goals (🏆): ship some content, e.g. an edited video on YouTube; content factory set up with a backlog." → Record edits and Beads changes applied (call setup tasks owned by others force-closed on Rufus's word); stretch goals added; week plan written to weeks/2026-10-26.md.
Built with LogoFlowershow