Open for commentsSelect text to comment

Project candidates — implicit projects without a record

TL;DR: The Projects by initiative view only shows projects that have a record. Active repositories and open Beads epics suggest about ten more real projects. Each row below has a recommendation; reply with the row numbers you accept and they become records (or sub-projects). Asana is out of scope for now (Rufus, 22 Oct 2026).

How these were found: life-itself repositories pushed since 1 August, open Beads epics in local checkouts, and "Pointer:" epics in planning, matched against the 18 existing project records.

Suggested new projects

#CandidateEvidenceInitiativeRecommendation
1Wisdom white paper launchrbook-8k3; planning pointer lip-kkqPublicationsAdd a record in 2rbook/projects/, owner Rufus, phase sharing (paper is live; launch and webinar 18 Nov remain)
2Collective Action course, autumn 2026 runplanning pointer lip-cff (starts 29 Oct)CoursesAdd a record; owner to name. Repo: collective-action or 2r-course
3Wise AI / AI sensemakingai-wise repo active; epics ais-61b (pipeline to essays), ais-q7s (website), ais-rpq (question tree)Life Itself ResearchAdd one record in ai-wise/projects/, with the website as a later phase rather than its own project
4Reason Commonsreasoncommons, reason-commons-tui, 2R-reason-commons all active; epic reasoncommons-bnl (explainers v2)IncubatorAdd one record covering all three repos; the white-paper modelling stays under Publications
5SoR experiences (poetic animated pieces)planning pointer lip-jle → design-323Media HouseAdd a record, or fold into Brand Rollout (2606) if it is only launch material. Recommend fold, unless it has its own owner
6Shared agent skillslife-itself/skills active; agentskills-3gx, lip-tqk.29Life Itself ManagementSub-project of PM Infrastructure (2605), record in skills/projects/
7Way Into AI (site redesign, weekly newsletter)wayintoai repo active; wayintoai-bnd, wayintoai-94n; CRM epic crm-dxb.7 migrates its subscribersnone fits; Incubator if Life Itself'sAsk: is this Life Itself or yours personally? Recommend personal (your own index), with the CRM migration staying in 2612
8ForumMagnum deploymentForumMagnum fork pushed 21 OctCommunity Chat?Ask what it is for; if it is a planned SoR forum, add a record under Gardens of Change, phase shaping
9Retreat; filmnamed in lip-kv8 (second-round SCQs: marketing, rebrand, retreat, film, content)Events; Media HouseAdd both as phase inbox, owner to name, so they are visible as ideas rather than missing

Not new projects (already covered, or not projects)

CandidateRecommendation
SoR website v1 (sor-website, sorw-ol5)Already 2609: planning holds a pointer, the record is sor-website/docs/project.md. Keep it its own project under Seeds of Renaissance rather than a sub-project of Brand Rollout (2606): it has its own repo, owner and done-when, so it is a branch you would pick on its own. 2606 links to it as a dependency.
SoR website review (2617)Make it a sub-project of 2609 (parent: 2609-seeds-of-renaissance-website), or close it into a sorw epic: it is one step of v1
CRM and newsletters (crm-dxb)Already 2612 Comms Infrastructure; move its record into crm/projects/ later
Migrate Over the Mountains to SoR platform (lip-42k.2.3)Part of Brand Rollout (2606)
PDF/EPUB publishing pipeline (prp-7ye)Part of Publications SOP (2613)
Ops backlog (lip-duo), Ops France meeting (ops-france-19t)Tasks within Operations (2604) and Ops France; no new project
Over the Mountains autumn series (lip-a7l), Elizabeth Debold series (lip-un1)In Asana; out of scope for now
Knowledge bases active this autumn: archipelago, plumvillage, sutras, wilber-wiki, without-hot-air, collective-action, library, climateOngoing gardens, not projects, unless you name one with a goal and an end

Record fixes found on the way

  • Seeds of Renaissance initiative points github at secondrenaissance (the old site, last pushed 15 Oct). Recommend adding sor-website (and later sor-community) via project_repos, and confirming whether secondrenaissance is retired.
  • 2609 phase says shaping, but the site is live at seedsofrenaissance.org and being built out: recommend shipping.
  • Global Connection Call epic calls-hwt in sor-community still says "ready to run (15 Oct)"; the first call is now 29 Oct.
  • Phases on 2601 and 2604 are inbox while their status is in-progress; recommend shipping (or shaping for 2601).
Built with LogoFlowershow